NABUT, Yovantianus V. (2019) Analisa Faktor-Faktor Paling Dominan Penyebab Keterlambatan Proyek (Lokasi Studi Pada Proyek Pembangunan Monumen Flobamora Rumah Pancasila). Undergraduate thesis, Universitas Katolik Widya Mandira Kupang.
Text
1. ABSTRAK.pdf Download (353kB) |
|
Text
2. BAB I PENDAHULUAN.pdf Download (311kB) |
|
Text
3. BAB II LANDASAN TEORI.pdf Restricted to Repository staff only Download (569kB) |
|
Text
4. BAB III METODE PENELITIAN.pdf Restricted to Repository staff only Download (609kB) |
|
Text
5. BAB IV ANALISIS DAN PEMBAHASAN.pdf Restricted to Repository staff only Download (694kB) |
|
Text
6. BAB V KESIMPULAN DAN SARAN.pdf Download (102kB) |
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TC Hydraulic engineering. Ocean engineering T Technology > TF Railroad engineering and operation |
Divisions: | Fakultas Teknik > Program Studi Teknik Sipil |
Depositing User: | S.Fil Lake Primus Sani |
Date Deposited: | 19 Dec 2022 06:12 |
Last Modified: | 19 Dec 2022 06:12 |
URI: | http://repository.unwira.ac.id/id/eprint/10778 |
Actions (login required)
View Item |