Evaluasi Waktu Penyelesaian, Biaya Proyek, dan Keuntungan Proyek Akibat Adanya Produksi Minimum Tenaga Kerja dan Peralatan (Studi Kasus: Rekonstruksi Jalan Oe'oh Ayotupas, Kabupaten Timor Tengah Selatan, Nusa Tenggara Timur)

BABYS, Margareth Evelyn (2025) Evaluasi Waktu Penyelesaian, Biaya Proyek, dan Keuntungan Proyek Akibat Adanya Produksi Minimum Tenaga Kerja dan Peralatan (Studi Kasus: Rekonstruksi Jalan Oe'oh Ayotupas, Kabupaten Timor Tengah Selatan, Nusa Tenggara Timur). Undergraduate thesis, Universitas Katolik Widya Mandira Kupang.

[img] Text
ABSTRAK.pdf

Download (1MB)
[img] Text
BAB I.pdf

Download (82kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (199kB)
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (126kB)
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB V.pdf

Download (33kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (839kB)

Abstract

The construction sector plays an important role in the development of a country's infrastructure. The success of a construction project depends not only on careful planning and work, but also on efficient cost management. This study aims to determine the completion time, project cost, and project profit due to the minimum production difference between labor and equipment. This study uses secondary data taken from CV. Carmel is in the form of data on the Cost Budget Plan (RAB) for the Oe'oh Ayotupas road reconstruction project, South Central Timor Regency, East Nusa Tenggara Province, namely volume, unit price analysis, unit price, and coefficient. The results of this study show that the completion time in the liquid asphalt binder seepage work item is 3.43 hours with the largest minimum production of 1,369.86 mɜ/hour and in the fc'20 Mpa concrete pair work item has a completion time of 1.35 hours with the smallest minimum production of 2.49 mɜ/hour. The asphalt pavement work item has a project cost of Rp. 862,319,350.54 while the drainage work item has a project cost of Rp. 9,037,474.70. The profit obtained based on the minimum production of labor is Rp.120,334,261.59 and the profit based on the minimum production of equipment is Rp.103,486,759.62. Based on the results obtained, it can be seen that the larger the minimum production, the longer the completion time, the project costs will be small, and the project profits will increase. On the other hand, if the minimum production is small, then the turnaround time is faster, the project cost increases, and the project profit will decrease.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Minimum Production, Completion Time, Project Cost, Project Advantage
Subjects: H Social Sciences > HC Economic History and Conditions
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Program Studi Teknik Sipil
Depositing User: Margareth Evelyn Babys
Date Deposited: 09 Oct 2025 02:45
Last Modified: 09 Oct 2025 02:45
URI: http://repository.unwira.ac.id/id/eprint/22054