BALAWALA, Godelfridus Boli Adam (2015) Hubungan Antara Harga Satuan Tenaga Kerja, Material, dan Peralatan Terhadap Biaya, dan Keuntungan Proyek. Undergraduate thesis, Universitas Katolik Widya Mandira.
Text
Abstrak.pdf Download (539kB) |
|
Text
Bab I.pdf Download (51kB) |
|
Text
Bab II.pdf Restricted to Repository staff only Download (127kB) |
|
Text
Bab III.pdf Restricted to Repository staff only Download (71kB) |
|
Text
Bab IV.pdf Restricted to Repository staff only Download (303kB) |
|
Text
Bab V.pdf Download (52kB) |
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | H Social Sciences > HF Commerce > HF5601 Accounting T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Program Studi Teknik Sipil |
Depositing User: | S.Kom Sela Mikado |
Date Deposited: | 02 Sep 2022 06:17 |
Last Modified: | 02 Sep 2022 06:17 |
URI: | http://repository.unwira.ac.id/id/eprint/8298 |
Actions (login required)
View Item |