Items where Subject is "T Technology > TE Highway engineering. Roads and pavements"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: B | F | L | R | S
Number of items at this level: 9.

B

Babis, Frengky (2014) ANALISA PENGARUH AKTIVITAS KAMPUS DAN SEKOLAHAN TERHADAP KAPASITAS SERTA TINGKAT PELAYANAN JALAN (Studi Kasus Jl. Jenderal A. Yani Depan Kampus Universitas Widya Mandira Kupang). Diploma thesis, Widya Mandira Catholic Univercity.

Bastian, Marthinus Alexander (2015) ANALISA PENGARUH VARIASI BATU BULAT TERHADAP KEPADATAN DAN NILAI CBR PADA CAMPURAN AGREGAT KELAS A. Diploma thesis, Widya Mandira Catholic Univercity.

Bau, Adri Irvan Bele (2016) ANALISA SUPERELEVASI PADA TIKUNGAN JALAN ADI SUCIPTO, SEGMEN UNKRIS – UNDANA (STA 0+000 – STA 0+850). Diploma thesis, Widya Mandira Chatolic University.

Bau, Adri Irvan Bele (2016) ANALISA SUPERELEVASI PADA TIKUNGAN JALAN ADI SUCIPTO, SEGMEN UNKRIS – UNDANA (STA 0+000 – STA 0+850). Diploma thesis, Widya Mandira Chatolic University.

Bili, Jeferson Rino (2016) HUBUNGAN ANTARA PERCEPATAN WAKTU PELAKSANAAN DAN BIAYA PELAKSANAAN PROYEK DENGAN METODE JALUR KRITIS ( Studi Evaluasi Pada Proyek Pembangunan Jalan Motamasin-Laktutus ). Diploma thesis, Widya Mandira Catholic Univercity.

F

Fiel, Ortencio (2015) PENGARUH NILAI ABRASI AGREGAT KASAR QUARRY BIPOLO DAN QUARRY TAKARI TERHADAP KARAKTERISTIK CAMPURAN BETON ASPAL (LASTON AC-WC). Diploma thesis, Widya Mandira Catholic Univercity.

L

Lama Ola, Yolanda (2015) “EVALUASI PRODUKSI BERDASARKAN RENCANA ANGGARAN BIAYA DAN LAPANGAN, TERHADAPAP WAKTU PENYELESAIAN SERTA BIAYA TENAGA KERJA DAN PERALATAN” STUDY KASUS : Proyek Pekerjaan Peningkatan Jalan Berlokasi di Barate – Manubelon - Naikliu – Kabupaten Kupang. Diploma thesis, Widya Mandira Catholic Univercity.

R

Rebhung, David Kenichi (2015) EVALUASI GEOMETRIK JALAN RUAS JALAN R. A. KARTINI, KOTA KUPANG, PROVINSI NTT (STA 0+000 – STA 0+400). Diploma thesis, Widya Mandira Chatolic University.

S

Sifa, Yuvitriani (2016) ANALISA PENGARUH KETERLAMBATAN DISTRIBUSI MATERIAL TERHADAP PRODUKSI MINIMUM, BIAYA PROYEK, KEUNTUNGAN PROYEK, DAN WAKTU PENYELESAIAN PROYEK (Studi Kasus Peningkatan Jalan Bolok Batakte-Kupang Barat). Diploma thesis, Widya Mandira Chatolic University.

This list was generated on Mon Aug 21 01:19:24 2017 WITA.