REMET, Dorothea Dade Pretty (2019) Analisis Pengaruh Penambahan Jam Kerja Efektif Terhadap Waktu Penyelesaian, Distribusi Material Dan Biaya Proyek (Lokasi Studi Pada Proyek Pembangunan Gedung Kampus STAKN Kupang). Undergraduate thesis, Universitas Katolik Widya Mandira.
Text
ABSTRAK.pdf Download (582kB) |
|
Text
BAB I.pdf Download (34kB) |
|
Text
BAB II.pdf Restricted to Repository staff only Download (363kB) |
|
Text
BAB III.pdf Restricted to Repository staff only Download (63kB) |
|
Text
BAB IV.pdf Restricted to Repository staff only Download (896kB) |
|
Text
BAB V PENUTUP.pdf Download (27kB) |
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TD Environmental technology. Sanitary engineering T Technology > TH Building construction |
Divisions: | Fakultas Teknik > Program Studi Teknik Sipil |
Depositing User: | S.Fil Lake Primus Sani |
Date Deposited: | 24 Nov 2022 06:35 |
Last Modified: | 24 Nov 2022 06:35 |
URI: | http://repository.unwira.ac.id/id/eprint/10305 |
Actions (login required)
View Item |