RADJA, Dahlia Mayesticha Manu (2019) Evaluasi Produksi Berdasarkan Rencana Anggaran Biaya Dan Lapangan, Terhadap Waktu Penyelesaian, Biaya Tenaga Kerja Dan Peralatan Serta Keuntungan Dari Pekerjaan (Lokasi Studi Pada Proyek Peningkatan Struktur Jalan S. K. Lerik Kota Kupang, Tahun Anggaran Dak 2018). Undergraduate thesis, Universitas Katolik Widya Mandira Kupang.
Text
ABSTRAKSI.pdf Download (998kB) |
|
Text
BAB I.pdf Download (83kB) |
|
Text
BAB II.pdf Restricted to Repository staff only Download (419kB) |
|
Text
BAB III.pdf Restricted to Repository staff only Download (115kB) |
|
Text
BAB IV.pdf Restricted to Repository staff only Download (922kB) |
|
Text
BAB V.pdf Download (75kB) |
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | H Social Sciences > HG Finance T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Program Studi Teknik Sipil |
Depositing User: | S.Fil Lake Primus Sani |
Date Deposited: | 19 Dec 2022 04:50 |
Last Modified: | 19 Dec 2022 04:50 |
URI: | http://repository.unwira.ac.id/id/eprint/10769 |
Actions (login required)
View Item |