Hubungan Perubahan Produksi Tenaga Kerja Dan Peralatan Terhadap Waktu Penyelesaian Item Pekerjaan Dan Biaya Serta Keuntungan Proyek

SAUNOAH, Dominggus Steven (2015) Hubungan Perubahan Produksi Tenaga Kerja Dan Peralatan Terhadap Waktu Penyelesaian Item Pekerjaan Dan Biaya Serta Keuntungan Proyek. Undergraduate thesis, Universitas Katolik Widya Mandira.

[img] Text
Abstrak.pdf

Download (816kB)
[img] Text
Bab I.pdf

Download (218kB)
[img] Text
Bab II.pdf
Restricted to Repository staff only

Download (578kB)
[img] Text
Bab III.pdf
Restricted to Repository staff only

Download (131kB)
[img] Text
Bab IV.pdf
Restricted to Repository staff only

Download (856kB)
[img] Text
Bab V.pdf

Download (302kB)

Abstract

The success of a project is determine by the resources as quality, reliable, and experience of labor, material and equipment so that avoid tardiness of project implementation. To examine further about project implementation, have to do research by an essay entitled “Relations Of Labor and Equipment Production Change To The Time Of Completion Work Items, The Fee and The Project Profit”, so it can be known and analyzed about completion of time, project fee, and the project profit. The data about volume, coefficient, and unit price obtained from road and bridge construction project by PT. Nanda Karya Putra Pratama in So’e, South Timor Tengah Regency. The study conceptualized by calculate the labor and equipment production variation from -25% until +25% with interval ±2.5%. If from calculation, percentation is negative so the production decrease otherwise if percentation is positive so the production increase. Based on the analyze and results, it showed that labor and equipment production is affect for the time of completion work items, the fee and the project profit. If production decrease so the time to completion work time will increase, project fee will be greater, project profit decrease, and vice versa. However, for the smooth implementation needs provision of labor production as quality and competent human resources then the adequate of equipment production.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Project, Production, Time, Fee, Profit
Subjects: H Social Sciences > HF Commerce > HF5601 Accounting
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Program Studi Teknik Sipil
Depositing User: S.Kom Sela Mikado
Date Deposited: 02 Sep 2022 00:47
Last Modified: 02 Sep 2022 00:47
URI: http://repository.unwira.ac.id/id/eprint/8276

Actions (login required)

View Item View Item