Analisis Peluang Pengembangan Jaringan Jalan Berdasarkan Sebaran Point Of Interest (POI) Pendidikan Di Kecamatan Kelapa Lima

KLAU, Novalinda (2023) Analisis Peluang Pengembangan Jaringan Jalan Berdasarkan Sebaran Point Of Interest (POI) Pendidikan Di Kecamatan Kelapa Lima. Undergraduate thesis, Universitas Katolik Widya Mandira Kupang.

[img] Text
ABSTRAK.pdf

Download (377kB)
[img] Text
BAB I.pdf

Download (322kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (488kB)
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (323kB)
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (941kB)
[img] Text
BAB V.pdf

Download (367kB)

Abstract

The development of a road network in urban areas is needed to improve the standard of living and facilitate the continuity of the people in the area. The development of the road network is needed to support the growth of education in strategic areas that greatly affect the movement of society. This research was conducted with the aim of knowing the condition of the road network, and the priority order of road network development in Kelapa Lima District. In this study, the road sections studied were each road segment leading to educational facilities in Kelapa Lima District, totaling 30 roads. The AHP method is used to determine priority road development criteria. The assessment criteria used in this study are 6 main criteria, 16 sub-criteria. The six main criteria are road surface condition, type of road surface, accessibility, mobility, traffic, and road width. From the results of the analysis, the priority level of road network development is obtained, with the top 10 namely: road section 1) Jln. CHR Ndun, 2)Jln. Prof. Dr. Herman Yohanes Gang Cekdam, 3)Jln. Lamp Km. 10, 4) Jln. Mentari II A Km. 6 Oesapa 5)Jln. Timor Raya Oesapa, 6)Jln. Damai II, 7)Jln. Timor Raya Oesapa, 8)Jln. Suratim Km. 10, 9) Jln. Sumba Tuak methamphetamine, and 10) Jln. Greater Timor Km. 11.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: road network, AHP method, priority road development
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Program Studi Teknik Sipil
Depositing User: S.T Novalinda Klau
Date Deposited: 22 Feb 2023 05:54
Last Modified: 22 Feb 2023 05:54
URI: http://repository.unwira.ac.id/id/eprint/11795

Actions (login required)

View Item View Item