Analisis Bangkitan Dan Tarikan Perjalanan (Studi Kasus Pada Tata Guna Lahan RSUD S.K Lerik Kupang Pada Kondisi Poliklinik Beroperasi Dan Tidak Beroperasi)

DURMAN, Yulianus (2024) Analisis Bangkitan Dan Tarikan Perjalanan (Studi Kasus Pada Tata Guna Lahan RSUD S.K Lerik Kupang Pada Kondisi Poliklinik Beroperasi Dan Tidak Beroperasi). Undergraduate thesis, Universitas Katolik Widya Mandira Kupang.

[img] Text
ABSTRAK.pdf

Download (2MB)
[img] Text
BAB I .pdf

Download (117kB)
[img] Text
BAB II .pdf

Download (196kB)
[img] Text
BAB III.pdf

Download (187kB)
[img] Text
BAB IV .pdf

Download (168kB)
[img] Text
BAB V.pdf

Download (70kB)
[img] Text
DAFTAR PUSTAKA DAN SURAT BEBAS PLAGIASI.pdf

Download (559kB)

Abstract

The presence of a hospital in a land use will cause an increase in traffic generation and attraction. This research aims to create a model of attraction and trip generation caused by land use at the S.K Lerik Regional General Hospital. The research was carried out by taking primary data in the form of the number of attractions and trips generated on weekdays and Sundays at S.K Lerik Regional Hospital, while secondary data in the form of the number of employees, the number of inpatient beds and the number of polyclinics, was obtained from the hospital management. Data processing was carried out using the multiple linear regression method, then the correlation coefficient, coefficient of determination and f-test were carried out using the SPSS application. Next, the multiple linear regression equation is used to model the attraction and generation of trips on the land use of RSUD S.K Lerik. The results of correlation and calibration tests show that trip generation on Sunday (Y1), trip generation on Sunday (Y2), trip generation on Monday (Y3) and trip generation on Monday (Y4) are influenced by the number of employees (X1) and the number of polyclinics (X2) and the number of inpatient beds (X3). The regression model equation is Y1 = -26.629 + 0.250X1 - 4.301X2 + 0.561X3; Y2 = -39.142 + 0.131X1 + 2.256X2 + 0.490X3; Y3 = 303.286 + 0.233X1 - 27.595X2 + 0.963X3; Y4 = 645.203 + 0.165X1 - 33.691X2 - 1.218X3.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Trip Generation, Trip Attraction, Hospital, Regression.
Subjects: H Social Sciences > HE Transportation and Communications
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TE Highway engineering. Roads and pavements
T Technology > TH Building construction
Divisions: Fakultas Teknik > Program Studi Teknik Sipil
Depositing User: S.T Yulianus Durman
Date Deposited: 14 Apr 2024 09:41
Last Modified: 14 Apr 2024 09:41
URI: http://repository.unwira.ac.id/id/eprint/15871

Actions (login required)

View Item View Item